Projects Completed
1 Creechurch Place
Energi IQ were appointed to complete a Level 5 EPC Plus Report for One Creechurch Place in London. This report put forward several site-specific…
Chancery House, London
Energi IQ was appointed to complete a Dynamic Overheating Assessment, SBEM Calculation and Non-Domestic EPC and for the redevelopment of an existing nine storey…
40 Bank Street, Canary Wharf
Energi IQ were appointed to complete a Level 5 EPC Plus Report for the 40 Bank Street in Canary Wharf. This report put forward…
Lacon House, London
Energi IQ were appointed to complete a Level 5 EPC Plus Report for Lacon House in London. This report put forward several site-specific measures…
Leon House, Croydon
Energi IQ was appointed to complete 263 no. Part L SAP Compliance Certificates and ‘On Construction’ Energy Performance Certificates for this 22-storey redeveloped building…
Terminal 2, Heathrow Airport
Energi IQ were commissioned to undertake the Part L compliance SBEM Calculations for the Aer Lingus Gold Circle Lounge at Terminal 2, Heathrow Airport.…
One Canada Square, Canary Wharf
Energi IQ completed a Level 5 EPC Plus Report for One Canada Square, Canary Wharf – the largest office building in the UK. The…
Castle Square, Elephant and Castle
Energi IQ recently completed 21 no. Part L SBEM Calculations and ‘On Construction’ Non Domestic Energy Performance Certificates for the new retail development at…
Fort Dunlop, Birmingham
Energi IQ were appointed to complete a Level 5 EPC Plus Report for Fort Dunlop in Birmingham – a Grade A listed building which…
CABÜ By the Sea
CABÜ By the Sea is a new luxury seaside resort, featuring 13 eco-friendly cabins that recently opened in St Marys Bay, Kent. The cabins…
Matalan Distribution Centre, Liverpool
Energi IQ were appointed to complete a Level 5 EPC Plus Report for Matalan Distribution Centre in Liverpool. This report put forward several site-specific…
The Pollen Estate, London
Energi IQ were appointed to deliver 55 no. EPC Plus Reports for The Pollen Estate in Mayfair for their office space and retail outlets…
Maritime and Coastguard Agency
Energi IQ were appointed in the delivery of 10 no. Non Domestic EPCs and EPC Plus Reports for the Maritime and Coastguard Agency (MCA)…
Cargiant, Willesden
Over the past 15 years, Energi IQ have completed in excess of 200 Commercial EPCs for Cargiant on their 48-acre site in Willesden. Since…
Satellite 1, Stansted Airport
Energi IQ were appointed to complete a Level 5 EPC Plus Report for Satellite 1 in Stansted Airport. This report put forward several site-specific…
5 Callaghan Square, Cardiff
Energi IQ were appointed to complete a Level 5 EPC Plus Report for 5 Callaghan Square in Cardiff. This report put forward several site-specific…
Vineyards, Essex
Energi IQ was commissioned by the developer Silvertown Properties to complete the SAP Calculations and ‘On Construction’ EPCs for this development of 4 no.…
DHL Distribution Centre, Lancashire
Energi IQ were appointed to complete an EPC Plus Report for Matalan Distribution Centre in Lancashire. This report put forward several site-specific measures for…
41 Lothbury, London
Energi IQ were appointed to complete an EPC Plus Report for 41 Lothbury – a Grade II listed building in the heart of London.…
RFCA Coulsdon
Energi IQ was appointed to complete a Prediction of Operational Energy Consumption (POEC) modelling analysis for a proposed new Accommodation Block for the RAF…
The Tri Centre, Swindon
Energi IQ were appointed to complete an EPC Plus Report for The Tri Centre in Swindon. This report put forward several site-specific measures for…
Capital Building, Liverpool
Energi IQ were appointed to complete a Level 5 EPC Plus Report for the Capital Building in Liverpool. This report put forward several site-specific…
240 High Street, Sutton
Energi IQ was appointed to completed a Dynamic Overheating Assessment for this residential development in Sutton town centre. This assessment was carried out in…
150 St Vincent Street, Glasgow
Energi IQ were appointed to complete an EPC Plus Report for 150 St Vincent Street in Glasgow. This report put forward several site-specific measures…